“Slavia” business and residential complex
The 1st and the 2nd construction stage were commissioned in December 2008
Description:
Q-ty of sections – 2
Q-ty of floors: in one section – 18 (including 2 underground floors);
In second section – 23 (including 2 underground floors).
Frame of the building – reinforced monolithic;
Outer walls – floor by floor brickwork;
Flooring – monolithic, reinforced;
Lifts – 2 in each section (passenger/cargo and passenger);
Heating and hot water supply – autonomous boiler house (roof);
Air conditioning system- centrally directed, including chiller and conduit system of pipes (stop valves on bends);
Floor to ceiling height- 3,3 meters in residential premises and 3,9 meters- in non-residential;
Heating system: centrally directed, radiators and meter- counters are installed;
Water supply: pipelines with hot and cold water ( stop valves and meters are installed);
Sewage facilities.
Completed construction works:
Internal works:
- Earthwork operations
- Piled foundation
- Foundation and framework constructions out of reinforced concrete
- Brick laying
- Metal constructions
- Roofing
- Window, stained glass and entry elements enclosing parts
- Electrical heating of roadway inlet
- Interior finishing
- Floor construction
- Outside finish of sole plate with granite
- Façade finishing with aluminum composite materials and “Dryvit” heating system
- Door constructions
- Water supply and sewage
- Heating
- Electricity supply and electric lighting
- Installation of weak current circuits
- Lighting immunity
- Ventilation and conditioning systems, heating and cold supply
- Fire-fighting measures
- Boiler house and heating unit arrangements
- Fire-proofing treatment of metal constructions
- Mounting works, testing and commissioning of lifting equipment
Out of door supply nets:
- Installation of transformer box with capacity of 1600 kilovolt-Amperes
- External nets for water supply and sewage
- External nets for gas supply
- External nets for electricity supply
- Creation of living environment