Trade center “Terra”, Topol
Completed construction works:
Internal works:
- Earthwork operations
- Piled foundation
- Foundation and framework constructions out of reinforced concrete
- Brick laying
- Metal constructions
- Roofing
- Window, stained glass and entry elements enclosing parts
- Electrical heating of roadway inlet
- Interior finishing
- Floor construction
- Outside finish of sole plate with granite
- Façade finishing with aluminum composite materials and “Dryvit” heating system
- Door constructions
- Water supply and sewage
- Heating
- Electricity supply and electric lighting
- Installation of weak current circuits
- Lighting immunity
- Ventilation and conditioning systems, heating and cold supply
- Fire-fighting measures
- Boiler house and heating unit arrangements
- Fire-proofing treatment of metal constructions
- Mounting works, testing and commissioning of lifting equipment
Out of door supply nets:
- Installation of transformer box with capacity of 1600 kilovolt-Amperes
- External nets for water supply and sewage
- External nets for gas supply
- External nets for electricity supply
- Creation of living environment