Trade center “Terra”, Topol

Completed construction works:

Internal works:

  • Earthwork operations
  • Piled foundation
  • Foundation and framework constructions out of reinforced concrete
  • Brick laying
  • Metal constructions
  • Roofing
  • Window, stained glass and entry elements enclosing parts
  • Electrical heating of roadway inlet
  • Interior finishing
  • Floor construction
  • Outside finish of sole plate with granite
  • Façade finishing with aluminum composite materials and “Dryvit” heating system
  • Door constructions
  • Water supply and sewage
  • Heating
  • Electricity supply and electric lighting
  • Installation of weak current circuits
  • Lighting immunity
  • Ventilation and conditioning systems, heating and cold supply
  • Fire-fighting  measures
  • Boiler house and heating unit arrangements
  • Fire-proofing treatment of metal constructions
  • Mounting works, testing and commissioning of lifting equipment

Out of door supply nets:

  • Installation of transformer box with capacity of 1600 kilovolt-Amperes
  • External nets for water supply and sewage
  • External nets for gas supply
  • External nets for electricity supply
  • Creation of living environment