Olvia construction company took part in the implementation of the investment project for the construction of the air separation unit ASI-25 for MMK them. Ilyich, PJSC. The complex included an air separation unit with liquid oxygen storage, as well as a gasification station.
The capacity of the equipment will be 25 thousand cubic meters of gaseous oxygen per hour.
Construction company "Olvia" performed the following works on the site:
- Liquid oxygen storage and gasification stations - monolithic works
- Block of auxiliary premises - monolithic works
- Block of auxiliary premises - arrangement of load-bearing and enclosing structures
- High and low-pressure oxygen routes to the consumer - monolithic works; installation of metal structures
- Section of cryogenic pipelines to the point of storage connection - monolithic works; installation of metal structures
- Steam and condensate route - monolithic works; installation of metal structures
- Block of attached premises - monolithic works; installation of metal structures
- Compressed air and nitrogen route - monolithic works; installation of metal structures
- Cooling water route - monolithic works; installation of metal structures
- Turbine hall foundations - monolithic works
- Block of attached premises (Floor structures) - monolithic works
- Turbine hall building - installation of metal structures
- Foundations for turbine hall equipment - monolithic works
- Overpasses inside the turbine hall - installation of metal structures
The following works were performed at the facility:
- Cold block - installation of metal structures
In total, the construction company "Olvia" will perform at the facility:
- 5 021 m3 - monolithic structures
- 1 800 tons - installation of steel structures
- 6 147 m3 - excavation
- 18 552 m3 - backfill
As of February 24, 2022, due to the imposition of martial law, the construction company "Olvia" suspended work on the site