- 2004 Surgical building of the regional children's clinical hospital in Dnepropetrovsk, 6 th. sq. m. The whole complex of works "turnkey". At the specified site, Olvia construction company performed the functions of a General Contractor, as well as 70% of the total volume of work was performed on its own.
- 2008 Residential complex at Dnepropetrovsk city, Ulyanova Str., the area makes 21 th. sq. m. Construction of the monolithic frame of the building is 8,4 th. m3. Details
- 2008 Residential building with premises of a commercial complex at the address Dnepropetrovsk city, K. Marx Ave. (1-2 turns), area makes 22 th. sq.m. The whole complex of works "turnkey". On this object, Olvia construction company served as the General Contractor, as well as 78% of the total volume of work was performed on its own. Details
- 2010 Administrative and residential building for “Maysadur Semans Ukraine” in the settlement of Mogilyov village, Dnipropetrovsk region. The whole complex of works "turnkey". At the specified site, Olvia construction company performed the functions of a General Contractor, as well as 92% of the total amount of work was performed on its own. Details
- 2010 Parking of office and residential complex in Dnipropetrovsk city, K. Marx Ave. (4th stage), area makes 6,5 th. sq.m. The whole complex of works "turnkey". On this object, Olvia construction company performed the functions of a General Contractor, as well as 93% of the total volume of work was carried out on its own. Details
- 010 Seven-story hotel, located in the city of Dnepropetrovsk along Krasnaya str., Area makes 5,6 th. m2. At this facility, Olvia construction company acted as a General Contractor. The foundations, frame, heating, and exterior and interior decoration were carried out on their own. Details
- 2011 Multifunctional building for residential and public use on Ispolkomovskaya str. near “Cascade-Plaza” in the area of No. 1 building in Dnepropetrovsk (under construction). Monolithic frame. Details
- 2012-2014 The second stage of the "Krutogorny" town-planning ensemble. “Kamenya” residential complex (1st stage of construction) in the area of Dzerzhinsky Str. and Kolodezna Str., 2nd start-up complex house No. 3 and No. 4 ". Total area makes 20 th. sq. m. Details
- 2012-2013 TPTNK "Ceramist" apartment house on the K. Marks Str.,18a in Yalta. Details
- 2014 – 2015 Multifunctional complex of civil and residential purposes (shop, housing, cafes, office space) on the Plekhanov St. Kharkovskaya st. – Glinka st. - Mironova st. (Babushkinsky district) in Dnepropetrovsk. Details
- 2014 Sports and fitness complex on Ilyich Avenue in Dnepropetrovsk. Details
- 2018 2-storey Urban concept restaurant of the international restaurant chain KFC, Panikahi Str., Dnepr. Details
- 2018 The construction of a residential building (stage II, section 3, 4) along the Mandrykovskaya Str. in Dnepr. Details
- 2019-21 Port City business complex on the r.Dnepr embankment. The total area of the facility is 27.8 th. square meters, the living area is 17.3 th. square meters. At the specified facility Olvia construction company performed the functions of the General Contractor. Details
- 2021 Construction of a Forest Hill residential complex on Bogdan Khmelnitsky Avenue (Works as General Contractor and Developer) Details