- 2007. Warehouse terminal of class "A" of the “Agora-rent” company along Zaporizhia highway, 14 thousand square meters. The whole range of turnkey work on our own. Details
- 2008. Warehouse complex: Malinovskogo str. 114, area 16,5 thousand square meters. The whole range of work was carried out 100% on our own. Monolithic construction, metal frame, walls, and "sandwich" roof. Details
- 2009 - Reconstruction of the production building of LLC “Sakura” in Pavlograd city, Dnipropetrovsk region. Dairy shop. The whole range of turnkey work. At the specified facility, CC “Olvia” performed the functions of the General Contractor, as well as 80% of the total volume of work, was performed on its own.
-
2011- Gas stations in the urban settlement Yubileiny, Dnipropetrovsk region (under construction). The whole range of turnkey work. At the specified facility, the construction company “Olvia” performed the functions of the General Contractor, as well as 70% of the total volume of work, is carried out on its own. Details
-
2011 - 2012. Construction of a wastewater treatment plant in the city of Kryvyi Rih. The whole range of turnkey work. At the specified facility, the construction company “Olvia” performed the functions of the General Contractor, as well as 70% of the total volume of work, which is carried out on its own. Details
- 2013-2014 Reconstruction of the Commercial Dairy Farm No. 2 under the agricultural complex for the production and storage of seeds of sunflower corn and rapeseed with a total capacity of 18,250 tons/year LLC "Maesodur Semans Ukraine" in Mogilyov village, Tsarichansky district, Dnipropetrovsk region. III turn. (France). Details
- 2013 - 2015 Air distribution station, Air Separation Unit (ASU) Linde in Kryvyi Rih city, Dnepropetrovsk region / Ukraine. On the territory of Mittal Steel Arcelor. Details
- 2014 Drop hammer plant. Plot No. 2. Open warehouse of secondary scrap. New construction. Sites No. 1,3,4. Mittal Steel Arcelor in Kryvyi Rih city. Details
- 2014 Extension to the warehouse of the port complex along Verstova Str, 43-Av in the Dnepropetrovsk city.
- 2015 Construction of a covered metal warehouse, Nikmet-Terminal SC, for PJSC ArcelorMittal Kryviy Rih. Details
- 2015 Reconstruction of a 6 kV substation with a room for the temporary stay of NS-2 personnel and NS-7 household premises for PJSC ArcelorMittal Kryvyi Rih.
- 2014 - 2015 Reconstruction of a complete transformer substation (CTS-3) of the air separation plant KAR-30M1 No. 7 for PJSC ArcelorMittal Kryvyi Rih.
- 2015 Drop hammer plant. Plot No. 2. Mechanical scrap processing department (MSPD). Concreting the site around the Pequeter Press B-1642 for PJSC ArcelorMittal Kryvyi Rih. Details
- 2015 Construction and installation work on external networks of compressor stations of compressed air No. 7, 8, 10, 13, 14, 32B and compressor station No. 19, for EVRAZ-DMZ named after Petrovsky, PJSC.
- 2015 Reconstruction of hot water supply rolling mill № 3. Boiler. For ArcelorMittal Kryviy Rih PJSC
- 2015 New oxygen unit (60 thousand m3 / hour) with adjustable production level. (Installation of complete pumping stations for storm sewage) for ArcelorMittal Kryviy Rih PJSC
- 2016 Reconstruction of the crane runways at the warehouse of Nikmet-Terminal SC for PJSC ArcelorMittal Kryviy Rih
- 2016 Drop-hammer plant. New construction of the complex (site) for the processing of scrap and rolled products. Civil works and Power supply, fire extinguishing, security alarm system. Details
- 2016 Oxygen production. Reconstruction of the oxygen supply system of the converter shop with the installation of new oxygen pressure control lines in the territory of ArcelorMitall Kryvyi Rih PJSC at Ordzhonikidze, 1 in the Dzerzhinsky district of Kryvyi Rih. Details
- 2016 Reconstruction of the coke-oven battery complex No. 5, 6 for ArcelorMittal Kryvyi Rih PJSC. Details
- 2016 Capture shop. Replacing the evaporator No. 1 of the ammonia-sulfate department of the CCP trap shop in the territory of the enterprise of ArcelorMittal Kryvyi Rih PJSC in the Dzerzhinsky district, Kryvyi Rih city
- 2016 Installation of WSA units on the territory of the enterprise of ArcelorMittal Kryvyi Rih PJSC.
- 2015 -2016 TWS-1. Repair of the roof of the building MC250-3 for, PJSC. Details
- 2016 Reconstruction of the gas supply system of the Dzherelo boiler house for ArcelorMittal Kryvyi Rih, PJSC.
- 2016-2017 New construction of an open coal and coke warehouse in the warehouse and pre-production workshop of ArcelorMittal Kryvyi Rih, PJSC at Ordzhonikidze str, 1 Dzerzhinsky district of the city of Kryvyi Rih. Arrangement of a warehouse with a platform for unloading coke and coal from railway wagons. Details
- 2017-2018 The construction of the complex of continuous casting machine No. 4 for MMK was named after Ilyich, PJSC. Caster installation with built-in rooms. Details
- 2017-2018 Reconstruction of gas cleaning systems of sintering machines No. 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sintering machines No. 7-12 for MMK named after Ilyich, PJSC. Details
- 2017-2018 Reconstruction of a group of rough stands of a wide-strip mill 1700 LPC-1700 for MMK named after Ilyich, PJSC. Mariupol, Levchenko st., 1." Details
- 2017-2018 Overhaul of DP-3 for MK AZOVSTAL, PJSC (Reconstruction with new construction). Details
- 2017 Reconstruction of the aspiration technical installation (source 205, 209, 210, 211) for Arcelor Mittal Kryvyi Rih, PJSC. Details
- Reconstruction with the replacement of the gas exhaust ducts. The construction of new gas-cleaning plants for the converter №4,5. I, II stage of construction. Knots of regulation of oxygen supply to converter tuyeres. Arcelor Mittal Kryvyi Rih, PJSC.
- 2017. Reconstruction of the department for continuous casting of steel with the installation of a second continuous casting machine and a two-position ladle-furnace in the territory of ArcelorMittal Kryvyi Rih, PJSC. Krivorozhstal, st. 133, Metallurgical district, Kryvyi Rih, Dnipropetrovsk region. Details
- 2017. "Department of continuous casting of steel. Reconstruction of an in-plant automobile congress from the “Central” overpass in the territory of ArcelorMittal Kryvyi Rih, PJSC, located at Krivorozhstal st. 133, in the Metallurgical District of Kryvyi Rih city, Dnipropetrovsk region". Details
- 2017 Mining department. Crushing factory-3. Crusher casing. Installation of KKD 1500/180 crusher. Arcelor Mittal Kryvyi Rih, PJSC. Details
- 2018 New construction of the warehouse of ingots in the preparation train at the territory of ArcelorMittal Kryvyi Rih, PJSC. Details
- 2018 New construction of a warehouse for billets of the department for continuous casting of steel at the converter shop in the territory of ArcelorMittal Kryvyi Rih, PJSC. Details
- 2018 Steel-making department. Converter workshop. Main building. Block 1. Restoration of roof and wall structures in GD / D1 span, in axes 6-16, chimney ramps and centralized control unit. ArcelorMittal Kryvyi Rih, PJSC.
- 2018 Reconstruction of the continuous casting of steel with the installation of a complex of machines for continuous casting of billets No. 2 and No. 3, Krivorozhstal st., 133, Metallurgichesky district, Kryvyi Rih, Dnipropetrovsk region. Engineering communications and water treatment system of ArcelorMittal Kryviy Rog, PJSC. Details
- 2018-2019 Reconstruction of small-section mill 250-4. Rolling mill № 2. for ArcelorMittal Kryvyi Rih, PJSC, at Ordzhonikidze str., 1 in Dzerzhinsky district of the Kryvyi Rih city. Details
-
2018-2019 Energy Department. Oxygen production. Oxygen regulatory point of the converter shop. Installation of filters on high-pressure oxygen pipelines of ArcelorMittal Kryvyi Rih, PJSC. Details
- 2018-2019 Reconstruction of buildings and structures of the complex of sinter machines No. 4,5,1 sinter shop No. 2. for ArcelorMittal Kryvyi Rih, Inguletsky District, Krivoy Rog, Dnipropetrovsk Region. Details
- 2019 Roll-mill Department. Section rolling shop No. 2. MS 250-4. Replacing tape glazing and coating slabs. ArcelorMittal Kryvyi Rih, PJSC
- 2019 Water supply shop. Replacement of the left pipeline of the reverse conditionally "clean" cycle from the pumping station No. 7 in GP-7.8 DC-1 on the site of the blast-furnace and steel-smelting workshops of the ArcelorMittal Kryvyi Rih, PJSC.
- 2019 Converter shop. Workshop for the production of slide gates. Installation of equipment for maintenance and repair of crystallizers and TPM LFCC. ArcelorMittal Kryvyi Rih, PJSC
- 2019 Reconstruction of the department for continuous casting of steel with the installation of a complex of continuous casting machines for billets No. 2 and No. 3. Installation and commissioning of airmail, argon ramp, and argon track for express laboratory. ArcelorMittal Kryvyi Rih, PJSC
- 2019 Sinter department. Blast-furnace shop №2. Installation of near-face slag granulation. Cleaning the premises of slag granulation pumping stations. ArcelorMittal Kryvyi Rih, PJSC
- 2019 Installation of a system (wet cleaning) at the coke sorting and reloading unit RU-1K, the complex of coke oven batteries No. 5.6 for ArcelorMillal Kryvyi Rih, PJSC.
- 2020 Construction work on the repair of BF-7 for ArcelorMittal Kryvyi Rih, PJSC
- 2021 Sinter shop №2. Repair of the building of agglomeration No. 2, for ArcelorMittal Kryvyi Rih, PJSC.
- 2020-21 Agglomeration department. Blast furnace No. 8, blast-furnace shop No. 1 (mechanical installation work, metal structures, electrical equipment). ArcelorMittal Kryvyi Rih, PJSC. Details
- 2020-21 Steelmaking department. Converter shop. Reconstruction of slag department No. 1 in axes 1-11 for ArcelorMittal Kryvyi Rih, PJSC Details
- 2020-21 Construction of a new pelletizing plant. Site preparation for ArcelorMittal Kryvyi Rih, PJSC Details
- 2021 Section rolling shop. Reconstruction of small section mill 150-5. Replacement of drum shears for cutting finished rolled products for ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Repair of the battery cyclone of sintering machine No. 2 for ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Rolling shop №1. Reconstruction of the building of wire mill 250-1 (with replacement of layers) on the territory of ArcelorMittal Kryvyi Rih, PJSC Details
- 2020-21 Design, supply, installation supervision, supervision, and commissioning of wet-type dust-collecting equipment for the project "Reconstruction of buildings and structures of sintering shop No. 2" for ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Small-cut mill 250-3. Roof replacement and construction and installation works for ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Rental department. Blooming. Section of the mill 1300. Overhaul of the refractory warehouse building for ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Converter shop. Bulk material supply path. ArcelorMittal Kryvyi Rih, PJSC
- 2020-21 Construction of an air separation unit ASU-25 and an oxygen gasification station for MMK named after Ilyich, PJSC (foundations of an oxygen storage facility and a block of auxiliary rooms, enclosing structures, architectural and construction works, installation of metal structures) Details
- 2021 Reconstruction of the gas cleaning system of convectors in the oxygen-converter shop for MK "Azovstal", PJSC (complex of works on the installation of reinforced concrete structures of all objects, installation of a new overpass)
- 2020-21 Reconstruction with new construction of aspiration systems for the bunker rack of BF-5 for MMK named after Ilyich, PJSC (excavation, dismantling, reinforced concrete structures, architectural and construction solutions) Details
- 2018-2021 Reconstruction of a group of roughing stands of a 1700 wide-strip mill (reinforced concrete structures, dismantling works) for MMK named after Ilyich, PJSC
- 2018-20 Overhaul of blast furnace No. 3 for MK "Azovstal", PJSC (reconstruction with new construction. Reinforced concrete structures, installation of metal structures, roads, and landscaping)
- 2019-20 Converter shop. Workshop for the manufacture of slide gates. Installation of equipment for maintenance and repair of crystallizers. ArcelorMittal Kryvyi Rih, PJSC
- 2020 Construction of a hydraulic coiler in the Sheet-rolling shop-1700 for Ilyich Iron and Steel Works, PJSC (dismantling works, excavation works, installation of sheet piling) Details
- 2021 Construction of a thickening complex for enrichment wastes for mining and processing plant "Severnyi" (preparatory work)
- 2020-21 Renovation of a part of the premises of the trade and warehouse complex at 9 Truda Avenue in the city of Dnipro for Dneprobltorg
- 2022-22 Steelmaking Department. Converter shop. Feed tract of loose materials for ArcelorMittal Kryvyi Rih PJSC Details