Water Treatment Plant Cleaning System
As part of the investment project “Construction of two new continuous casting machines for continuous casting machines of continuous casting machines No. 2,3,” PJSC “ArcelorMittal Kryvyi Rih”, Building company “Olvia” performed the design and construction of a water treatment station for the continuous casting section of steel WEST 2, WEST 3 ; installation of external engineering systems (oxygen, argon, natural gas, compressed air) for WEST 2, WEST 3.
In this project, BC “Olvia” completed:
- Complex of civil works
- A set of works on the installation of equipment supply SMS group S.p.A.
- Power bridge (flyovers for pipelines)
- Outdoor tracks
- Complex of electrical work
- Installation and automation of heating, ventilation and air conditioning systems
- Water supply and sewerage
- Automated process control system
- Automation systems for instrumentation and automation
- Commissioning works
Technological pipelines:
- indirect (non-contact) cooling circuit;
- direct (contact) cooling circuit;
- cooling circuit of crystallizers CCM-West-2,3;
- sludge treatment circuit;
- chemical dosing system;
- water pretreatment system.
Pipeline overpass from the water treatment station to DCCS-2
During the construction of a water treatment plant:
- 1031 tons of technological pipelines and 550 tons of technological equipment were mounted
- 6702 m of pipelines with thermal insulation were laid
- 4539 m3 monolithic reinforced concrete structures were mounted
- More than 60.4 km of cable lines have been laid.
Installation of water treatment plant equipment
The company has completed all project documentation for this facility according to DBN A2.2-3: 2014 in a 3D model.
Commentary by the Deputy Director for Technical Issues:
The construction of a water treatment plant is designed to cool and process the water supply to consumers of the continuous casting section of the complex of continuous casting machines West-2,3 at PJSC “ArcelorMittal Kryvyi Rih”, which is one of the key investment projects of PJSC “ArcelorMittal Kryvyi Rih”. The total cost of the entire complex is estimated at approximately 140-150 million US dollars.