Construction company "Olvia" performed a complex of construction and assembly works under the project of reconstruction of the PS 250-1 building with the replacement of coilers for ArcelorMittal Kryvyi Rih PJSC.
The main scope of reconstruction:
- Replacement of existing layers and tribes
- Installation of protective shelters, fences, and structures
- Reconstruction and strengthening of foundations for equipment
- Reconstruction of the premises of the fire extinguishing station under the premises of hydraulics and lubrication
- Arrangement of a modular compressor station with auto access
- Installation of an air receiver with piping and fittings
- Installation of a pipe bending mill
- Arrangement and connection of all communications (hydraulics, lubrication, cooling, compressed air, power supply)
Danieli is the supplier of the main process equipment for the project.
Construction company "Olvia" performed the following scope of work within the project:
- Dismantling work;
- Excavation;
- Repair and restoration work;
- The full range of construction and installation works:
- Arrangement of a platform for a modular compressor station;
- Reconstruction of the room for hydraulics and lubrication;
- Installation of a foundation for equipment;
- Installation of technological equipment;
- Installation of technological pipelines;
- Installation of instrumentation and electrical equipment;
- Laying of cable lines;
- Implementation of a concrete road;
- Flushing and testing of technological pipelines;
- Functional tests, commissioning;
- Integration of a new layering process control system (jointly with Danieli);
- Obtaining all necessary equipment permits
An important feature of the project was the implementation of construction and installation works with operating technological equipment.