Olvia construction company carried out a complex of works within the project of repair and restoration of construction structures of the steel-smelting department of the converter shop for ArcelorMittal Kryvyi Rih PJSC
Performed on site:
- Dismantling works (metal structures, reinforced concrete structures, floors, ceilings, etc.)
- Repair and restoration works (metal structures, reinforced concrete structures, anti-corrosion protection)
- Earthworks
- Installation of monolithic reinforced concrete structures
- Production and installation of metal structures
- Arrangement of walls, windows, roof
- Finishing works
- Installation of cable lines
The converter workshop includes a complex of conveyors that transport lime, dolomite, and coal from the minus 2-meter mark to the 32-meter mark. The length of the gallery is 216 meters.