Olvia Construction Company performed overhaul of blast furnace №8 located in blast furnace shop №1, PJSC ArcelorMittal Kryvyi Rih
The project included:
- Dismantling works (metal structures, concrete structures, pipelines, equipment);
- Manufacturing and installation of metal structures;
- Arrangement of water supply, heating, sewerage systems;
- Installation of ventilation, air conditioning, aspiration systems;
- Installation of technological pipelines;
- Installation of technological equipment;
- Installation of refrigeration plates;
- Insulation works and lining;