Construction company "Olvia" performed a complex of works within the framework of the project: "Arrangement of ventilated facades with replacement of the air conditioning system and roof elements of the buildings of the IOC, KPP-12a, KPP-12b, complex of buildings of the engineering building" on the territory of PJSC "ArcelorMittal Kryvyi Rih" .
During the works, ventilated aluminum facades were installed, which give the buildings a more attractive, authoritative and modern look, and made it possible to correct problems that usually arise during years of operation.
Defects of the facades have been corrected, issues related to ensuring effective preservation of heat in winter and reducing the possibility of overheating of the facade in summer have been resolved.
More than 450 air conditioners were transferred and a condensate drainage system was installed. The presence of such a system ensures the collection of unnecessary water, formed as a result of the operation of air conditioners, and draining it to a clearly defined place.
According to the signed contracts, the construction company "Olvia" performed at the facility:
- Dismantling work
- Cladding of facades with panels TM "Alyufas" (more than 14.5 thousand m2)
- Thermal insulation with mineral wool boards / expanded polystyrene (more than 11 thousand m2)
- Repair and restoration work of reinforced concrete structures
- Wall decoration with ceramic tiles
- Monolithic polycarbonate cover
- External drainage system device
- Roof
- Transfer of more than 480 air conditioners with the installation of a drainage system for condensate removal
- Replacement of heat pipe insulation
You can get acquainted with the experience of the Olvia construction company in the direction of installation of ventilated facades by link