ArcelorMittal Kryvyi Rih PJSC continues the large-scale modernization of agglomeration plant No. 2. This is one of the company's key investment projects, which will significantly reduce the industrial load on the region and the city.
As of 09/07/2022, all 6 sintering machines of the workshop were reconstructed.
Olvia сonstruction company at the site performed works on the reconstruction of sintering machines #1-5 and also performs works on the reconstruction of buildings and structures of sintering shop #2.
Works on the reconstruction of sinter machines No. 1-4 were performed as a general contractor and general designer.
During the reconstruction, the following works were performed on each of the sinter machines:
- Installation of a new gas collector and ignition furnace;
- Replacement of the main components of the linear cooler;
- Installation of a new overflow conveyor and sintering carts;
- Reconstruction of the linear cooler;
- Commissioning of a new type of exhauster;
- Installation and commissioning of a new electro filter for the tail parts of the sinter machine.
Reconstruction of the return flows was also carried out with decommissioning of the extinguishing drums, installation of metal structures of PV No. 13, installation of conveyor covers of galleries 32 and 33 made of corrosion-resistant steel, and installation of technological equipment of the wet gas treatment plant.
As of 09/07/2022 Olvia construction company performs at the facility:
- Repair of the building of the agglomeration workshop - 2 (installation of wall fences);
- Arrangement of the foundations of the material composition;
- Installation of metal structures of material composition;
Olvia сonstruction company started work in agglomeration shop No. 2 from the reconstruction of sinter machine No. 5. As a result of updating the second sintering shop, dust emissions on each of the six sintering machines have been reduced by 250 tons per year.