Olvia construction company performed a complex of works within the project of reconstruction of slag department No. 1 in axes 1-11 for ArcelorMittal Kryvyi Rih, PJSC. The department is part of the converter shop of the steelmaking department. In the slag department, the primary processing and shipment of slag, which is used in the production of steel, is carried out.
Olvia construction company performed the following works at the facility:
- Obtaining permission to perform construction and installation works;
- Dismantling of metal structures, reinforced concrete structures, technological pipelines, cable products, railway track and technological equipment;
- Earthworks, backfilling;
- Arrangement of the pile foundation;
- Arrangement of foundations under the frame of the building;
- Construction of a reinforced concrete road;
- Arrangement of railway tracks, stops and crossings;
- Installation of monolithic and monolithic heat-resistant walls and framework ceilings;
- Masonry of walls from ceramic and silicate bricks;
- Production and installation of metal structures;
- Installation of industrial floors;
- Installation of cable products;
- Construction of the transformer substation building;
- Installation of lighting systems;
- Installation of water supply and sewage systems;
- Installation of heating, ventilation and air conditioning systems;
- Installation of communication systems;
- Production and installation of switchboard equipment;
- Installation of technological equipment;
- Installation of technological steel pipelines;
Also, within the framework of the project, works were carried out on the improvement of the territory. The facility was put into operation in July 2022 with all the necessary commissioning works.